Catalogue

LG FM41AH (12.3 kW) - three-phase multi-system outdoor unit for 7 indoor units

CL-000937
260 35200 ₴
Out of stock
14 days
Our advantages
Delivery terms and cost
Payment options

Description LG FM41AH

The FM41AH: a three-phase multi system at 12.3 kW

The FM41AH is an LG multi-system outdoor unit with a three-phase 380 V, 50 Hz supply: 12.3 kW cooling and 13.5 kW heating, R410A refrigerant, Dual Inverter compressor. The casing is 950 mm wide, 1380 mm high and 330 mm deep, built of metal with plastic parts. Manufacturer country and country of origin are Korea, with a 24-month warranty. According to the manufacturer the system serves up to seven indoor units - the scale of an office floor, a shop with back-of-house areas or a clinic. Its single-phase relative is the FM40AH (item 1860) at 11.2 kW cooling; the choice between them is decided not by capacity but by the supply the premises have.

Why three phases are better at this capacity

At the same capacity a three-phase machine draws roughly a third of the current on each phase, and every practical advantage follows from that. The first is the cable: the cross-section for a three-phase circuit is smaller, and on a long run from the board that is a noticeable difference in both material and labour. The second is balance: the load spreads across three phases, and the rest of the equipment on site does not suffer from a skew. The third is protection: breakers and protective devices work well within their ratings rather than at the edge. The fourth is the future: if more equipment arrives, headroom remains on a three-phase supply, whereas one overloaded phase allows nothing more to be added.

Phase sequence and voltage imbalance: checks before start-up

A three-phase connection adds items that single-phase does not have, and they are checked before the first start. First, the correct phase sequence: equipment with an inverter drive has protection, but relying on it as a normal operating state is unwise, so phasing is checked with an instrument. Second, no lost phase: running on two phases means a fault for three-phase equipment, and on networks with overhead lines it happens. Third, voltage imbalance between phases: if it is outside the permitted range, that is a question for the network and the board rather than for the air conditioner. Fourth, earthing and surge protection, because inverter electronics are the most sensitive part. All of this goes into a record before commissioning, and it is that document which later settles any warranty dispute.

12.3 kW across seven rooms

Seven indoor units means five or six offices plus a meeting room and reception, or a sales floor with several back rooms. Capacity is distributed unevenly: rooms with people, south windows and equipment get more, while back rooms and corridors get less or nothing. Judging simultaneity correctly matters: in an office every room is occupied during the same hours, so the sum of indoor ratings should not greatly exceed the outdoor capacity. In a shop it is the other way round: the sales floor works all day while the store and the office are used occasionally, and an overlap is acceptable. The permitted indoor combinations for the FM41AH are checked against the manufacturer's table before the order, because it is the set of units that most often turns out to be non-compliant.

Generators, outages and protecting the equipment

For commercial premises in this region the question of supply stands apart from the question of capacity. The first thing to establish is whether the system will run from a generator and whether that generator can carry the start of a three-phase machine this size - an electrician calculates it from the starting characteristics, not from the nameplate rating. Second: inverter equipment is sensitive to supply quality, so when running on a generator the stability of frequency and voltage is checked, not merely the fact that there is power. Third: after the mains return the system has to resume correctly, so automatic restart with the previous settings is enabled during commissioning. Fourth: a surge protection device at the incoming supply is the cheapest insurance for equipment of this value, and on sites with frequent outages it is essential.

The main line, branch boxes and route planning

The pipework arrangement in this class differs from domestic practice: one main line leaves the outdoor unit and divides at branch joints and distribution boxes. In this catalogue those are the PMBL5620 (item 1908) and PMBL1203F0 (item 1909) branch joints and the PMBD3620, PMBD3630 and PMBD3640 distribution boxes (items 1910-1912). The boxes go in service space, roughly at the centre of the group of rooms they serve, with access through an inspection hatch - the rule broken most often, after which checking a joint means cutting the ceiling open. The limits on main line length, total line length and height difference come from the model's data sheet, and we supply them before work starts. All vertical sections are fixed with vibration-isolating clamps so the hum does not travel through the building structure.

Heating commercial premises in the shoulder seasons

13.5 kW of heating lets the system warm the premises in cold weather, and for leased space without its own boiler room that is often the main way to heat offices in September and March. A heat pump in this mode is far more economical than electric convectors, because it moves heat in from outside rather than converting kilowatts directly. There are two limitations. The first is the outdoor temperature: heating output falls with frost, and in January the system becomes a supplementary source rather than the primary one. The second is the shared mode: all seven units work either on cooling or on heating, so in the shoulder seasons the sunny and shaded sides of the building cannot have different modes. Where that is critical, separate systems for zones of different orientation are provided at design stage.

The documents that should remain after installation

For premises with a three-phase supply and a seven-unit system, documentation is a condition of normal operation rather than a formality. You should hold: the pipe route drawing with lengths, diameters and branch positions; the nitrogen pressure test record with its hold time; the evacuation record; the charge calculation based on actual lengths; the commissioning report with pressures, per-phase currents and temperatures. Separately, the electrical side: the board schematic, breaker ratings, cable cross-section and the phasing test record. The service regime for commercial premises is twice a year, with every reading logged so that trends are visible. When something goes wrong two years later, it is these papers that decide whether it is a warranty case or a long argument.

Describe the premises - rooms, areas, operating hours and the parameters of the three-phase supply - and we will calculate the load per zone, verify the combination of units and select the branch boxes. For a larger site we will show how the bigger FM49AH and FM57AH differ, including their cable and protection requirements.

Characteristics LG FM41AH

Installation type
Зовнішній блок
Electrical properties
Current frequency
50Hz
High-voltage
380В.
Feeding
Number of phases
3
General characteristics
Appointment
Мульти-спліт (зовнішній блок)
BTU
42
Compressor type
Dual Inverter
Country of origin
Корея
Country of origin
Корея
Guarantee
24 months
Refrigerant
R410A
Type
Мульти-спліт
Manufacturer
LG
Overall dimensions
Outdoor unit height
1380 мм.
Outdoor unit length
330 мм.
Outdoor unit width
950 мм.
Physical properties
Material of execution
Combination of metal and plastic
Thermal properties
Cooling capacity
12300 Вт.
Thermal efficiency
13500 Вт.
Find similar

Reviews about LG FM41AH from real users

No reviews found

Store addresses
Working hours
Телефон
Availability
Maybe it will interest you
  • Recently viewed
  • Most popular
  • Sale
 
 
 
Швидко і якісно достявляємо

Наша компанія виконує доставку по всій Росії і ближньому зарубіжжі

Гарантія якості і сервісне обслуговування

Ми пропонуємо тільки ті товари, в якості яких ми впенені

Повернення товару протягом 30 днів

У вас є 30 днів, для того щоб протестувати вашу покупку