LG FM40AH (11.2 kW) - multi-system outdoor unit for 7 indoor units, R410A
Description LG FM40AH
The FM40AH: a Multi F Max class system at 11.2 kW
The FM40AH is the outdoor unit of an LG multi system rated at 11.2 kW cooling and 12.5 kW heating, using R410A refrigerant and a Dual Inverter compressor. The casing is tall and narrow: 950 mm wide, 1380 mm high, 330 mm deep; the supply is single-phase 220-240 V, 50 Hz. Manufacturer country and country of origin are Korea, the warranty is 24 months and the construction is metal with plastic parts. According to the manufacturer this model serves up to seven indoor units - twice as many as the domestic MU models - so the FM series addresses commercial premises rather than flats. The exact list of permitted indoor combinations is checked against the manufacturer's table before the order, because with this many ports the choice of units is more tightly constrained.
Branch boxes instead of seven lines from the unit
The main structural difference in this class is the pipework topology. Instead of a separate pair of pipes to each indoor unit, a main line leaves the outdoor unit and divides at branch joints and distribution boxes. In this catalogue those are the PMBL5620 (item 1908) and PMBL1203F0 (item 1909) branch joints and the PMBD3620, PMBD3630 and PMBD3640 distribution boxes (items 1910-1912) with three, four and more outlets. The practical gain is obvious: one main line runs in the wall or riser, and the short runs to individual units fan out on the floor itself, by the distribution box. That means less copper inside the structure, fewer chases and far less work when the rooms are scattered along a floor rather than sitting side by side.
R410A rather than R32: what it means in practice
The FM series runs on R410A - the generation of refrigerant before R32 - and an owner should know a few practical consequences. First: refrigerants are not interchangeable, and a system may be topped up only with what it was designed for, using the matching gauge equipment. Second: R410A has a higher global warming potential, so manufacturers are moving to R32 in new equipment and regulatory restrictions on R410A tighten over the years. Third: that is no reason to avoid a working system - service and refrigerant are available, and equipment of this class lasts a long time. But if you are designing a building from scratch with a ten to fifteen year horizon, the difference is worth raising with your designer.
Single-phase or three-phase supply
The FM40AH is the single-phase version, and the range includes its three-phase counterpart, the FM41AH (item 1863) at 12.3 kW cooling. Single-phase is chosen when the premises simply have no three-phase supply - in converted spaces, small shops, leased units with old wiring. Where three phases exist, the three-phase version is more practical: lower current per phase, a smaller cable and an even load on the incoming supply. For a load above 11 kW this is not a cosmetic difference: a single-phase load of that size noticeably affects the balance and the behaviour of protective devices when other equipment runs at the same time. The decision belongs to an electrician who has seen the actual supply, so it is worth showing them both models before ordering.
The premises this model suits
Typical cases are an office floor with several rooms, a shop with back-of-house areas, a medical centre, a small hotel, a salon with treatment rooms. They share one thing: many separate rooms, each with its own pattern of use, and no possibility of fitting seven individual outdoor units. On such a site the total capacity is not the only issue - zoning matters too, as rooms with people and equipment are loaded very differently, and units are sized zone by zone. For warehouses, large sales floors and high-ceilinged spaces this arrangement works less well: there, ducted or cassette units on separate systems or semi-industrial equipment make more sense. We always ask about the operating pattern: a shop open from ten to ten and an office working nine to six are different calculations.
A 1380 mm casing: position and installation
A tall narrow casing takes less floor space than two separate domestic units, but it needs serious fixings. A facade requires reinforced brackets anchored into the structure; on a roof or on the ground, a frame with resilient mounts raised above the surface. The weight calls for lifting equipment or a full crew, which should be agreed with the installers in advance, especially when the position is a plant area on a roof. Minimum clearances to walls are observed per the manual: a tall machine with a two-level coil is sensitive to recirculating its own hot air. Service access is planned from the start - a unit on a roof or in a plant area has to be reachable with tools, not merely visible from below.
Design: simultaneity and margin
On a site with seven rooms, simultaneity becomes the central question in the calculation. In an office all the rooms are occupied during the same hours, so exceeding the outdoor capacity with the sum of indoor ratings is riskier here than in a home, where rooms are used in turn. In a shop it is the reverse: the sales floor is loaded all day while the back rooms are used occasionally, and the sum may be larger. The second factor is people and equipment: every visitor, every monitor and every refrigerated display adds heat that an area-based calculation never sees. The third is the timetable: premises open until ten at night reach peak load just as the facade starts giving back the heat it stored during the day. A site like this is calculated room by room, not by multiplying floor area by a coefficient.
Service and documentation on a commercial site
A seven-unit system with a main line and branch boxes needs more documentation than a domestic split. After installation you should hold: the pipe route drawing with lengths, diameters and branch positions; the pressure test and evacuation records; the charge calculation; the commissioning report with pressures and currents. The service regime for commercial premises is twice a year: cleaning the coils, checking pressures, drains and electrical connections; indoor filters monthly, or more often in a kitchen or a dusty space. Pressure trends are watched separately: on a system with a main line and several branches a leak shows up as a gradual loss of performance across all the zones at once. For premises where the climate affects trading, a service contract with a fixed response time is worth more than any optional feature.
Describe the site - the list of rooms, their areas, the operating hours and whether a three-phase supply exists - and we will calculate the capacity per zone, verify the combination against the manufacturer's table and select the branch boxes. If there are more rooms or a higher load, we will show how the larger FM48AH and FM56AH differ in equipment and electrical requirements.
Characteristics LG FM40AH
Reviews about LG FM40AH from real users
No reviews found




